全部版块 我的主页
论坛 休闲区 十二区 休闲灌水 IDEAS/RePEc 排名
473 0
2005-06-16
英文文献:Time-to-plan lags for commercial construction projects
英文文献作者:Stephen D. Oliner,Daniel E. Sichel,Jonathan N. Millar
英文文献摘要:
Gestation lags have long been understood to be an important feature of the investment process. However, previous research has focused on the time-to-build part of the gestation period and has provided little information on the earlier time-to-plan period during which key decisions are made about the project's scope and financing. We develop new estimates of time-to-plan lags for commercial construction projects in the United States, using a large project-level dataset that allows direct measurement of planning lags. We find that these time-to-plan lags are long, averaging about 16months when we aggregate the projects without regard to size and about 26months when we weight the projects by their construction cost. The full distribution of time-to-plan lags is very wide, and we relate this variation to the characteristics of the project and its location. In addition, we show that time-to-plan lags lengthened by 3 to 4months, on average, over our sample period (1999 to 2010). Regulatory factors are associated with the variation in planning lags across locations, and we present anecdotal evidence that links at least some of the lengthening over time to heightened regulatory scrutiny.
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

栏目导航
热门文章
推荐文章

说点什么

分享

扫码加好友,拉您进群
各岗位、行业、专业交流群