全部版块 我的主页
论坛 休闲区 十二区 休闲灌水 IDEAS/RePEc 排名
437 0
2006-04-09
英文文献:Uncertainty and Time-to-Build in Bioenergy Crop Production
英文文献作者:Dumortier, Jerome,Kauffman, Nathan,Hayes, Dermot J.
英文文献摘要:
Over the last years, the cellulosic biofuel mandate has not been enforced by the U.S. Environmental Protection Agency. The uncertainty surrounding the enforcement of the mandate in addition to high production and harvest cost contributes to farmers' hesitation to plant bioenergy crops such as switchgrass and miscanthus. Previous literature has shown that under uncertainty and sunk cost, the investment threshold is further increased because of the value associated from holding the investment option. This warrants the use of a real option model. In this paper, we extend previous literature by applying a real option model to bioenergy crop production in the United States. We show the spatial allocation of switchgrass under biomass price and agricultural return uncertainty. The empirical model identifies the counties in the contiguous United States that are most likely to change to switchgrass production. Our preliminary results indicate a very small share of land in switchgrass production even at high biomass prices.
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

栏目导航
热门文章
推荐文章

说点什么

分享

扫码加好友,拉您进群
各岗位、行业、专业交流群