全部版块 我的主页
论坛 提问 悬赏 求职 新闻 读书 功能一区 悬赏大厅 文献求助专区
1744 9
2010-07-29
悬赏 25 个论坛币 未解决
1.Leachman, R. and R. Glassey (1987). Preliminary design and development of a corporate level production planning system for the semiconductor industry.这个在Google学术里只有引用没有原文,必须要外国公司或单位的内部数据库里才能搜出来。
2.Leachman, R. (1993). "Modeling techniques for automated production planning in the semiconductor industry." Optimization in Industry: 1-30. 这个在Google学术里只有引用没有原文,必须要外国公司或单位的内部数据库里才能搜出来。      
3.Leachman, R. and T. Carmon (1992). "On capacity modeling for production planning with alternative machine types." IIE transactions 24(4): 62-72. URL:http://www.informaworld.com/smpp/content~db=all~content=a779173848
4.Lee, Y. (2001). "Supply chain model for the semiconductor industry of global market." Journal of Systems Integration 10(3): 189-206.    (已求到)   
5.Harrison, J. (1991). Optimization techniques for production planning and scheduling of co-product networks, University of California, Berkeley.这个在Google学术里只有引用没有原文,必须要外国公司或单位的内部数据库里才能搜出来,麻烦哪位在国外读书或者外企的,能在单位内部数据库里搜一下,谢谢了
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

全部回复
2010-7-30 09:04:39
怎么没人理我啊
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

2010-7-30 11:41:44
Procedures for generating compact models that accurately characterize capacity limitations of alternative machine types are presented. Assuming that processing times among alternative machine types are identical or proportional across operations they can perform, capacity limitations of the alternative machine types can be precisely expressed using a formulation that is typically not much larger than the basic linear programming formulation that does not admit alternative resource types. These results suggest that in the case that processing times are nearly proportional among alternatives, the prevalent approximation that involves using a single, capacitated, artificial resource may be dropped in favor of the formulation incorporating the approximation that processing times among the alternatives are proportional. The set of capacity constraints formulated can be used to check the feasibility of suggested production schedules or demands simply by plugging them into the constraints, without developing values for allocation variables.
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

2010-7-31 13:02:19
不是没人理,是楼主资料太难找了
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

2010-7-31 14:41:19
1# betterpxb

楼主要的文献!
能力仅此而已!
附件列表

4.pdf

大小:538.36 KB

 马上下载

二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

2010-8-3 09:19:47
gl_sonei 发表于 2010-7-31 14:41
1# betterpxb

楼主要的文献!
能力仅此而已!
兄弟,这个悬赏怎么给你呢?麻烦说一下,小弟新来的,看了版规,里面说求助者和应助者协商,但是我不知道怎么交易。麻烦指教。谢谢了
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

点击查看更多内容…
相关推荐
栏目导航
热门文章
推荐文章

说点什么

分享

扫码加好友,拉您进群
各岗位、行业、专业交流群