1.Leachman, R. and R. Glassey (1987). Preliminary design and development of a corporate level production planning system for the semiconductor industry.这个在Google学术里只有引用没有原文,必须要外国公司或单位的内部数据库里才能搜出来。
2.Leachman, R. (1993). "Modeling techniques for automated production planning in the semiconductor industry." Optimization in Industry: 1-30. 这个在Google学术里只有引用没有原文,必须要外国公司或单位的内部数据库里才能搜出来。
3.Leachman, R. and T. Carmon (1992). "On capacity modeling for production planning with alternative machine types." IIE transactions 24(4): 62-72.
URL:http://www.informaworld.com/smpp/content~db=all~content=a779173848
4.Lee, Y. (2001). "Supply chain model for the semiconductor industry of global market." Journal of Systems Integration 10(3): 189-206.
(已求到)
5.Harrison, J. (1991). Optimization techniques for production planning and scheduling of co-product networks, University of California, Berkeley.这个在Google学术里只有引用没有原文,必须要外国公司或单位的内部数据库里才能搜出来,麻烦哪位在国外读书或者外企的,能在单位内部数据库里搜一下,谢谢了