全部版块 我的主页
论坛 提问 悬赏 求职 新闻 读书 功能一区 悬赏大厅
2694 1
2014-09-15
悬赏 10 个论坛币 未解决
1. Download from Quandl the quarterly S&P 500 Index ranging from 1988.Q1 to 2013.Q4.
2. Divide the series into the in-sample estimation window (observations up to and includ-
ing 2009.Q4) and the out-of-sample forecasting window (observations beginning from
2010.Q1 and onwards).
3. Produce the point and the interval forecasts using the simple exponential smoothing,
the Holt's linear trend, and the Holt-Winters additive seasonal models. Plot the three
graphs.
4. Estimate the rst-order autoregression, i.e. AR(1) process, and calculate the uncondi-
tional mean and the unconditional variance measures.
5. Produce the point and the interval forecasts from the estimated autoregression. Plot
the graph.
6. Within the rolling forecasting environment, generate one-step-ahead forecasts through-
out the out-of-sample set using the considered four models.
7. Calculate aand report the out-of-sample mean absolute error (MAE) and root mean
squared error (RMSE) measures. Which model is preferred?

初学R code 第六步与第七步没有思路,请帮帮忙。谢谢啦!
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

全部回复
2023-4-20 22:16:46
我想问下楼主,这个第六点用中文怎么翻译,主要是one-step-ahead forecasts, out-of-sample,这两个我不太会。Within the rolling forecasting environment, generate one-step-ahead forecasts through-out the out-of-sample set using the considered four models.
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

相关推荐
栏目导航
热门文章
推荐文章

说点什么

分享

扫码加好友,拉您进群
各岗位、行业、专业交流群