主要研究成果:
(一) 管理与决策思想方面,主要刊登於台大校友双月刊的一系列文章“从诺贝尔经济奖漫谈资源配置管理研究(如最适面、赛局互动面、行為面、机制面)”(66期 至76期; 可上台大网站http://www.alum.ntu.edu.tw/wordpress/免费下载)和(77期至79期之E-论坛)。
(二) 管理方法方面,较具代表性的文章如下:
1. Problems”Operations Research Letters 14, 215-220 (1993).
2. (SingleAuthor) “A Note on Heuristics for Flowshop Scheduling” Operations Research 44, 648-652 (1996).
3. (FirstAuthor) “Existence Results for VVIP”(with J.C. Yao) Applied Mathematics Letters 9, 17-19 (1996).
4. (First Author) “Optimal Makespan Scheduling with Uncertain Processing Times” (with Y.N.Sotskov, N.Y. Sotskova and F. Werner) Mathematical and Computer Modelling26, 67-86 (1997).
5. (FirstAuthor) “Sequencing with Uncertain Numerical Data for Makespan Minimization”(with Y.N. Sotskov) Journal of Operational Research Society 50, 230-243(1999).
6. (Co-author)“Onthe equivalence of extended generalized complementarity and generalizedleast-element problems” (with Q.H. Ansari and J.-C. Yao) Journal of OptimizationTheory and Applications 102, 277-288.
7. (Co-author)“Stability of Johnson’s Schedule with Limited Machine Availability” (with OBraun, and G. Schmidt, and Y.N. Sotskov) International Journal of ProductionResearch 40, 4381-4400 (2002).
8. (Co-author) “Flowshop Scheduling Problemto minimize total completion time with Random and Bounded Processing Times”(with Y.N. Sotskov and Ali Allahverdi) Journal of Operational Research Society 55, 277-286(2004).
9. (First Author) “Mean Flow TimeMinimization with Uncertain Processing Times” (with Y.N. Sotskov, N.Y. Sotskova and F. Werner) EuropeanJ. Operational Research 159, 558-573 (2004).
10. (Coauthor Author) “Schedule Execution forTwo-Machine Flow-Shop with Interval Processing Times” (with N.M. Matsveichuk,Y.N. Sotskov, N.G. Egorova) Mathematical and Computer Modelling 49,991-1011 (2009).
11. (CoauthorAuthor) “Scheduling linearly shortening jobs under precedence constraints”(with S. Gawiejnowicz, M.-H. Chiang) AppliedMathematical Modelling 35, 2005-2015.
12. (CoauthorAuthor) “Minimizingtotal weighted completion time under uncertainty using stability box anddominance” (with Y.N. Sotskov) Computers & Operations Research 39, 1271-1289.
13. (CoauthorAuthor) “Measures of problem uncertainty for scheduling with intervalprocessing times” (with Y.N. Sotskov & F. Werner) OR Spectrum (in press)